SVContact

From product certification to verified sink

GAP analysis for biochar

Find the weaknesses in your documentation before the inspector or verifier does. Choose a goal – EBC certification or a carbon credit methodology – and get a prioritised action list in 10–20 minutes.

EBC v10.5EPuro.earth 2025 v2Global Biochar C-SinkRainbow BiCRS v1.1EU CRCF 2026/285

What the GAP analysis assesses

The tool compares the producer’s documentation today with what an EBC inspector or a carbon credit verifier will ask for. Every question has a priority (critical, high or normal), an explanation of what is actually assessed, examples of acceptable evidence, common pitfalls and what to do if the evidence is missing.

The questions are grouped into six areas: foundation, feedstock and process, measurement and analysis, climate accounting, traceability and governance. Which questions appear depends on the goal, the facility type and the planned end use. A soil application register, for example, is only shown if the biochar goes to soil.

Two tracks: EBC certification and carbon credits

EBC certification

For producers certifying their production under the European Biochar Certificate. The questions follow guideline version 10.5E: registration and pre-audit, the feedstock positive list, batch rules, pyrolysis gas and emissions, sampling, analyses and limit values, labelling, health and safety, and preparation for the annual inspection.

Carbon credits

For producers moving from product certification to issued units. This covers the monitoring plan, mass balance per batch, durability approach, life-cycle calculation, methane, chain of custody to the final sink, ownership and uncertainty, adapted to the selected methodology.

Supported methodologies

Methodology versions the assessment is based on (checked 11 November 2026)
MethodologyVersionKeep in mind
European Biochar CertificateGuidelines v10.5E (August 2025)The class determines feedstocks and limit values. No EBC-Feed batches will be certified from 2027.
Puro.earth BiocharEdition 2025, version 2CORC200+, stricter biomass criteria, retail (R3) eligible under conditions.
Global Biochar C-SinkCurrent version (v3.x)Requires EBC- or WBC-certified biochar and registration in the C-Sink Registry.
Rainbow BiCRSv1.1 (January 2026)Modular methodology. Distributed kilns require an approved dMRV platform.
EU CRCF – Biochar Carbon RemovalDelegated Regulation (EU) 2026/285Maximum 50 t/ha cumulatively in soil, no issuance above ±20 % uncertainty, certified via recognised certification schemes.

How to read the result

Readiness is weighted by priority: critical items weigh three times as much as normal ones. Items marked not applicable are excluded. “Don’t know” and unanswered questions count as gaps until clarified. If any critical item is missing, the conclusion is always “Significant gaps remain”, whatever the percentage, so a high percentage cannot hide a critical gap.

The result shows how well the documentation is prepared. It is not a certification decision and does not in itself determine net storage or whether units can be issued.

Frequently asked questions

Are my answers saved?

Yes, but only in your own browser. You can close the page and continue later. Nothing is sent to Biocharking until you choose “Send the result”. You can also export the answers as a file and import them on another computer.

Do we need EBC certification to sell carbon credits?

It depends on the methodology. Global Biochar C-Sink requires EBC- or WBC-certified biochar. Puro.earth, Rainbow and the EU CRCF have their own requirements for analyses and contaminants, but EBC certification often makes the work easier. You can include the EBC questions even when the goal is another methodology.

How long does it take?

The EBC track has around ten questions and takes 10–15 minutes. The carbon credit track has 19–20 questions, more if the EBC questions are included. Allow 20–30 minutes if you add comments and document references.

Can you help us close the gaps?

Yes. Biocharking works with documentation, sampling plans, mass balance and preparation for inspection and verification. Contact us or send the result directly from the result page.