SVContact

SPECIALIST SERVICES

Pyrolysis consulting and process optimisation

When technology, feedstock and operation do not work together, you need to locate the constraint. Biocharking™ helps connect process data with product quality and the next action.

When is this support useful?

You may be choosing technology, starting a new line or operating a plant with inconsistent yield. The assignment starts with the decision you need to make: which feedstocks the plant must handle, which product you intend to supply and which operating conditions can be maintained.

A supplier brochure and one favourable analysis rarely provide a sufficient decision basis. We compare assumptions with available measurements and identify what needs verification.

Evidence to gather before the review

  • A process flow diagram covering the reactor, gas path, cooling and downstream treatment.
  • Feedstock specifications, moisture, particle size and variation between deliveries.
  • Operating records with timestamps, temperature measurement locations, feeding and stops.
  • Biochar analyses linked to the same operating periods.
  • Heat-use conditions and recorded energy consumption.

If information is missing, the first deliverable can be a measurement plan. This helps prevent investment decisions based on incomparable values.

How an assignment can work

  1. Scope: target product, feedstocks, capacity and decision point.
  2. Review: material and energy flows and existing records.
  3. Hypotheses: possible constraints and observations that distinguish them.
  4. Action plan: prioritised changes and a way to evaluate their effects.

Plant trials are planned with the producer’s responsible personnel. Changes need assessment against safety, supplier instructions and the certification applicable to production.

What will you receive?

A documented current-state assessment, questions for the technology supplier and a prioritised decision basis. Depending on scope, this can also include a requirements specification, comparison of technology options or an operating-data structure. Scope and deliverables are agreed before work starts.

How does process support differ from certification support?

Process support focuses on plant behaviour and causes of product variation. EBC support focuses on traceable practices and evidence throughout certification. The same operating data may support both, but the questions and decisions differ.